Author Supervision Engineer (Electrical), ELE
Описание
Calgary AB, Canada
Cell: +1(403) 617-7976
lekhkar@telus.net
To obtain a position as ELECTRICAL ENGINEER
summary
← 23 years of Engineering experience providing professional services to the oil and gas industry (+ 6 years as Industrial Field Electrician) in all aspects of project development, including conceptual, preliminary and detail design, commissioning and start up in long term and fast track projects at various levels of responsibilities in the Electrical Engineering with application of CEC, IEEE/ANSI, API, NFPA, IEC, NEMA/EEMAC, GOST, PUE, SNiP standards.
← Registration with APEGA as P.Eng (Member number is M96123).
Experience
2016-2020 Sr. Electrical Engineer, SUNCOR_FORT HILLS /Oil Mine, Calgary AB, Canada/ https://www.suncor.com/en-ca/about-us/fort-hills
← Did choose a design concept. Created DBM documents, project cost estimates in support to make a decision to proceed with DD.
← Decision maker & approver for all engineering procurement drawings, documents and design change requests.
← Provided construction support thru RFIs and engineering support on troubleshooting.
← Field Engineer: construction progress review & meetings, walk downs, commissioning and QA/QC. Supervised installation of electrical power equipment.
← Project Lead Engineer on FH OPTA East Tailing Management Project.
← Project Lead Engineer on Froth Unloading project.
← Project Lead Engineer on Steam Generators Emission Reduction project.
← Project Lead Engineer on Water Supply lines at Secondary Extraction Project to rеplасе 1600HP motors by 2500HP.
← Designed (for overall FH Plant) Grounding Study, Plant Load Flow Study, Relay Coordination and Arc Flash Study, Islanding and Load Shedding Analysis, Overall Harmonic Study, Pipeline Electrical Induction by 72KV overhead power lines study and Front End Engineering design report (327MVA plant total load).
← Designed EHT for water supply pipline (in-house).
← Evaluation of electrical equipment reliability for lifetime of the plant.
← Mentored junior and EIT Engineers.
2015-2016 Sr. Electrical Design Engineer, Vista Projects Engineering, Calgary AB, Canada/ https://www.vistaprojects.com
Imperial Oil, Aspen Feed SAGD Project - 2016
← In ETAP I designed 25kV & 13.8kV electrical power distribution system with captive gas fired turbine generators (GTG), and backup 25kV/4.16kV system. It included Load List and Equipment sizing. Total plant consume load is 29MVA.
← Responsible for creating MV & LV motor data sheets for quotation.
2014 – 2015 Sr. Electrical Engineer, Equinox Engineering, Canada/ https://equinox-eng.com
EnCana Phase 3 expansion of the KayBob Gas Plant project located at 15-31-062-21 W5M - 2015
This project included the design and installation of three sour processing trains (Train #4, 5 & 6), each sized for 25 MMscfd (708 e3m3/d) of raw inlet gas.
← Responsible for designing, procurement and Installation of new one MV (7.5MVA), one LV (2.5MVA) & three LV (1.0MVA) MCCs installed in complete MCC bldgs., and 1500kW Diesel Emergency Generator (separate bldg.). It includes but not limited to: Switchgears/MCCs, (3ea) MV 1250HP, (3ea) MV 600HP, (3ea) MV 300HP VFDs and step down 4160V/480Vpower transformers, NGRs, UPS, lighting transformers and panels inside bldgs., and so on.
EnCana Phase 2 expansion of the KayBob Gas Plant project located at 15-31-062-21 W5M - 2014-2015
This project included the design and installation of two sweet processing trains (Train # 2 & Train # 3), each sized for 25 MMscfd (708 e3m3/d) of raw gas.
← I designed, procured and controlled Installation of new one MV (5MVA) & one LV (2.5MVA) MCC complete bldgs., with Switchgears/MCCs, (2ea) MV 1250HP & (3ea) MV 400HP VFDs (standalone), step down 4160V/480Vpower transformers, NGRs, UPS, lighting transformers and panels inside bldgs., plus 1 MVA emergency diesel stand by generator (separate bldg.).
← The scope involved in design an Electrical Load List, SLD, Load Flow, Cable Sizing, Cable Schedules, Panel schedules, Cable Tray, Grounding and equipment Layouts. Prepared Data Sheets and MRQ’s for equipment procurement, Technical Bid Evaluations, vendor documents and client spec review.
← Communicated with VFD and MCC bldg vendors, and I designed a unique high efficiency HVAC system for MV MCC bldg where a high heat generating 4160V VFDs are installed inside. So in the winter time the bldg. is heated by running VFDs and the heaters are standing by. In a summer time all heated air is out from the VFDs to the outdoor, not affecting temperate inside MCC bldg.
2008 – 2012 Electrical Engineer, WorleyParsons, Calgary AB, Canada
2012 - 2014 Lead Electrical Engineer, WorleyParsons, Calgary AB, Canada/ https://www.worley.com/who-we-are
CNRL Upgrader project- 2013-2014
← For Central Gas Plant designed EHT for 2”, 16” and 20” 1000m long steel pipelines including ISO and Layout drawings, EHT calculations for MI cables using ComputerTrace software, VD and load calculations, power cable sizing, set point and panel schedules, MTO, control wiring and EHT skids procurement including power transformers, CB & Controller panels.
TALISMAN / PLAINS Midstream fast track projects- since 2011-2013
One of dozen projects was replacement of existing three 500HP pumps with 1200HP pumps, installation of new MV Switchgear/MCC in new MCC building, installation of new UPS and replacement of 13.8kV-4.16kV, 2 MVA transformer with 5 MVA transformer.
← I was responsible for electrical detail engineering and design including Electrical Load List, SLD, Cable Sizing, Cable Schedules, Panel schedules, Area Classification drawings, Cable Tray, Grounding and equipment Layouts. Participated in preparation of DBM and PEP. Prepared datasheets and MRQ’s for equipment procurement. Responsibilities included man-hour and cost estimate, technical bid evaluations, vendor documents review, Load Flow, Short Circuit, Arc Flash, Motor Starting, Protection Coordination studies using SKM software and Relay Settings. Designed EHT tracing for variety sizes and designations of piping lines with self-regulating EHT cable.
NEXEN, Well Pad 9112 & 9113- 2010-2011
← I was responsible for designing of MV/LV MCC building with all aspects including cable tray systems, regular and emergency lighting in and out buildings, HVAC, UPS, VFDs and power transformers at the Well Pad 9112 for the SAGD Central Process Facility at the Long Lake Commercial project.
SUNCOR Canada, SP FIREBAG Project, stage 2, Heavy Oil, Improve- 2009-2010
← For Central Processing Plant responsible for new steam generator building c/w 2 steam generator skids, MV 2000HP High Pressure Boiler Feed Water pump motors and associated MV and LV MCC’ as well as Emergency Power Generator Unit 600V, 500kW including Auto Transfer Switch and emergency MCC. Developed SLD and Area Classification drawings. Participated in preparation of P&ID’s and construction power design. Designed construction power substations grounding systems. Responsibilities include man-hour and cost estimate development of technical data sheets, MRQ’s and MRP’s, technical bid evaluations, vendor documents review, Electrical Heat Tracing design, preparation of Engineering Work Packages, Power System Analysis, Short Circuit, Arc Flash, Load Flow, Motor Starting, Protection Coordination study and relays settings.
SUNCOR Canada, Voyageur Project, Hydrotreaters- 2008-2009
Engineering design including drawings, calculations, CEC compliance, equipment specifications and materials, Oil Sands Plant and Voyager Upgrader.
My overall responsibilities within WorleyParsons Calgary are:
← Project Design coordination at all stages DBM & DD
← Work flow coordination and team leading
← Project Planning, Progress Report and Budget/ Engineering man-hours estimate
← Conducted technical peer review & KPI
← Preparation of Engineering & Construction Work Packages
← Designed MV/LV power distribution systems which includes load study, cables, power transformers, MCC and switchgears sizing, voltage drop; choosing soft starters, VFD, NGR and so
← Designed grounding, cable tray system, indoor & outdoor lighting and EHT
← Developed area class drawings & fugitive emission study for ventilation requirements
← Dealt with a procurement of electrical equipment at all stages and Technical Bid Evaluations
← Checking Engineering drawings
← Construction site visits as a Field Engineer and Quality Manager and provided construction supports during commissioning and start up, responded on PFIs
2006 – 2008 Electrical Specialist, CH2M Hill Canada Ltd., Calgary AB Canada
Petro Canada, Oil Sand Infrastructure, Vankor Oilfield Development
← Designed cable tray layouts and made cable tray fill calculations
← Designed lightning protection and grounding system
← Short-circuit studies and selection of electrical equipments, i.e. transformers, protective devices, switchgears
← Involved in design Power Distribution Systems, selection of LV and MV motors and motor control centers; distribution and control panels
← Security, work and emergency lighting layout design which includes Lighting calculations
← Voltage drоpcalculation and cable sizing
← Designed and developed standard detail packages
← Prepared SLD, specifications and material take-off
← Conducted vendor and material review
2004 – 2005 Field Electrical Engineer, CONTINENTIAL, Russia
← Management of all aspects and stage of design, production and implementation of electrical and control equipment
← Developed production plans, schedules and reports
← Was responsible for project planning and management
← Developed design documents, specifications, cost estimates and scopes of work
← Provided field service support during start-up operations
← Developed and implemented quality control programs
1998 – 2004 Field Electrical Engineer, Elcon, Russia
← Supervised installation of electrical power distribution systems (MV/LV transformers, MCC, VFD, 120/24V UPS, Lighting and EHT Panels) and emergency power, grounding and lighting, control schematic wiring, MV/LV cable installations & terminations, lightning protections, EHT and cable tray systems
← Ensuring the design is in accordance with applicable codes and standards
← Inspected and tested installation of electrical systems and equipment in the field
← Involved in electrical equipment start up and commissioning
Education / Additional training
B. Sc. in Electrical Engineering, University of Moscow, 1998
- Completed course in “Canadian Electrical Code and Theory”, SAIT, Calgary, AB, 2005
- Project Management Workshop 2008, Colt Companies Calgary, AB, 2008
- Seminar: ‘MV/LV Voltage Substation-Design, Testing and Maintenance Considerations’ Calgary, AB, 2012
- IEEE seminar: ‘Area Class design requirements’, 2012
- ETAP seminar, 2014
References upon request.
27 октября, 2016
Антон
Город
Свободный
Возраст
52 года ( 1 января 1972)
26 октября, 2016
Владимир
Город
Свободный
Возраст
49 лет ( 4 февраля 1975)
18 апреля, 2014
Мария
Город
Свободный
Возраст
41 год (13 апреля 1983)