Commissioning Engineer (Instrumentation for a major "Gas Processing Plant Construction Project")
Описание
Gadim Gasimov
19 May 1985
Gyzyl Sharg, Build. 332, Apt. 45, Baku, Azerbaijan
(+99450) 3100038
(+99455) 3105031
gadim.gasymov@gmail.com
PROFESSIONAL SUMMARY
A Qualified Professional offering nearly 13 years' experience in Instrumentation & Control Engineering encompassing Engineering & Designing, Operations & Maintenance, Construction & Commissioning
EDUCATION:
Duration:
Institution:
Subject:
Speciality:
Degree:
2006 - 2008 (Diploma with distinction)
Azerbaijan State Technical University
Technological machines
Instrument engineering (Engineer Technologist)
Master
Duration:
Institution:
Subject:
Speciality:
Degree:
2002 - 2006 (Diploma with distinction)
Azerbaijan State Technical University
Technological machines
Bio-medical engineering (Engineer Technologist)
Bachelor
WORK EXPERIENCE:
Since Jun'21 Maire Tecnimont - TCM-KT JV, Azerbaijan Baku as Commissioning Instrument Supervisor
Project Undertaken: SOCAR - HAOR Modernization and Reconstruction
To develop the detailed commissioning procedures for Instrument Items & Packages and procedures for the functional tests of the Instrument Items.
To check and prepare relevant Commissioning punch list.
Coordinate the activities of the Instrumental specialist.
Monitor and ensure the activities are carried out following the procedures and requirements.
Ensure all safety rules are followed in the field.
Supervise the works of vendors' specialists and ensure their efficient utilization.
Support Vendors' specialists in the execution of the job and coordinate their actions with the Commissioning supervisors.
To keep records of all activities performed in the logbook to monitor the progress achieved and apply necessary recovery actions.
To ensure that all the activities are witnessed by the Client, prepare and sign off all relevant certificates and hand them over to the certification engineer.
To produce the certificates, duly signed by the involved parties, and handover to the certification engineer (QA/QC).
Sep'19 - May'21 Kentech, Kazakhstan, Atyrau as Instrument Commissioning Engineer
Project Undertaken: TCO - FGP WPMP HPEO
Lead a team of Commissioning Supervisors and technicians.
Planning / execution of activities related to Pre-commissioning and Commissioning of Instrumentation systems of TengizChevroil Project in Kazakhstan
Responsible for the Commissioning of new wellheads, Metering stations, clusters
Monitoring contractor activities
Review of drawings, detailed field engineering, participation during the SAT of DCS/ESD/F&G systems, preparation of SAT procedures for vendor packages, B-ITR's, As-built drawings and Commissioning schedules
Coordinating with engineering department for updating documents such as Control Narrative, Cause & Effect diagrams, P&ID, ILD and instrument index.
Participation in Discipline mechanical completion walk downs and System hand over walk downs.
Assisting construction team in clearing the punches raising during walk down and clearing commissioning punches.
Raising software change request as per project needs. Testing and checking communications between several instrument cabinets.
Material and manpower management & maintaining commissioning spares list.
Planning of Vendor mobilization.
Reporting daily progress to Commissioning Manager
May'18 - Jul'19 Maire Tecnimont - Tecnimont Abu Dhabi Branch, UAE, Abu Dhabi as Commissioning Instrument Supervisor
Project Undertaken: Al Dabbiya Surface Facilities Phase III - ADCO Project (Onshore, Offshore Clusters)
Cooperate with the subcontractor, supervise and check the preparation of the loop folders due time prior to the beginning of the activity;
Supervises that all the FLC operations follow the proper flow of documentation and their timely execution;
Records the daily progress of the FLC and ensures its availability to management, QA/QC, planner etc.;
In case of deviation of actual progress from the scheduled activities, implements all the necessary actions involving the management;
Planning on daily basis the activity based on the list of the "Loops ready to test", on the manpower availability and following the priority provided by Commissioning management;
Manage the repairs of the instruments that need to be fixed or recalibrated with the support of the troubleshooting team;
Records and transmits to the construction any major problem which requires the involvement of the construction subcontractor (i.e. cable pulling, instrument relocation etc.);
Prepare the forms for all the tests to be performed and ensure submission of the certificates duly signed by involved parties for final hand over to the certification engineer (QA/QC);
Coordinate actions with the electrical commissioning supervisor in performing the activity;
Records in the master drawings all the modifications done during the FLC (for As Built);
Signs the documents (narratives and forms) and follow up for the PMC/Client signatures.
Jan'18 - Apr'18 Worley Parsons, Azerbaijan as Electrical and Instrument Supervisor
Project Undertaken: BP Onshore Brownfield projects (Sangachal Terminal)
Ensure Contractor timely arrival at work front
Ensure Contractor Permit Applicant delivers permit to site on time ready for work start
Attend and get involved in Tool Box Talk
At TBT Check Contractors have the correct and Good Quality PPE
Ensure task being completed is exactly as described on the Permit
Record Work Crew Arrival Time, Permit Issue Time, POB at site
Ensure Contractor has the right Tools for the job and they are in good Condition
Safety, always remember, you are empowered to "stop the Job" if something is not right.
Check Contractor has the correct and latest revision of the drawings
Check the quality of the work ensuring that it is in line with the project drawings and project specifications
Do not deviate from the drawings or specifications, raise Technical Site Query if in any doubt
Record daily progress and wrench time accurately
Regularly carry out site Audits
Record Contractor Finish Time
Apr'16 - Dec'17 Azfen J.V., Azerbaijan as Instrumentation Commissioning Engineer
Project Undertaken: BP - Shah Deniz Stage 2 Offshore and Onshore Greenfield Project
Execution of the commissioning activities during the construction/commissioning phase and Start Up at the onshore and offshore locations
Instrument Engineering data verification into Completions database
Ensure correct technical integrity is achieved and maintained for all Instrument Systems prior to handover to Operations
Assist commissioning group and operations personnel assigned to the commissioning group at the onshore and offshore locations
Review Operational Test Procedures associated with the Commissioning of Instrument systems;
Provide input for the most effective use of vendors
Input to the development of the detailed plan including reporting of progress
Attending Commissioning and inter Department meetings
Support of the discipline commissioning engineers in achieving the commissioning scope
Ensure that changes implemented during the commissioning activities are approved and documented
Participate in the hand over acceptance of system/s sub-system/s with the Mechanical Completion and Operations group
Liaison with construction in providing and achieving the milestone objectives
Supervision of discipline personnel for the technical content and quality of work.
Monitoring progress of work under the Lead Engineer's control and achieving completion within the agreed schedule
Handling site activities, inspection and interaction with QC team to achieve high quality standards, possess and aptitude for teamwork.
Responsible for the direct control and implementation of pre-commissioning and commissioning activities carried out by sub-contractors, vendors and operations personnel
May'14 - Jan'16 Amec Foster Wheeler, Azerbaijan as Instrumentation Commissioning Engineer
Project Undertaken: BP Onshore and Offshore Brownfield projects (Sangachal Terminal and Platforms)
Supervising of loop checks and function tests activities for the control and protection systems, and troubleshooting activities of PLC and other controllers
All DCS process control sequencing logic testing and ESD logic testing.
Working with ABB system
Generation of all types of Records for Quality Control Checks Including Calibration, Leak Checks and other Inspections.
Handling site activities, inspection and interaction with QC team to achieve high quality standards, possess and aptitude for teamwork.
Responsible for the management and supervision of all Instrument Commissioning Technicians.
Responsible for the direct control and implementation of pre-commissioning and commissioning activities carried out by sub-contractors, vendors and operations personnel.
May'12 - Sep'13 SWIFT Worldwide Resources (Airswift), Azerbaijan as Instrumentation Commissioning Engineer
Project Undertaken: BP COP-WC West Chirag Oil Project
Commissioning of Fire and Gas system.
Supervising of loop checks and function tests for the control and protection systems, troubleshooting activities of PLC and other controllers, commissioning of DGL, DGI, DGA, DFO, DSO, DHR and etc. (Micropack, Simtronics, MEDC, Drager, GASSONIC, Vesda, Det-Tronics)
All DCS process control sequencing logic testing and ESD/Fire & Gas Cause & Effect logic testing.
Working with Emerson (DeltaV) system
Handling site activities, inspection and interaction with QC team to achieve high quality standards, possess and aptitude for teamwork.
Responsible for the management and supervision of all Instrument Commissioning Technicians.
Responsible for the direct control and implementation of pre-commissioning and commissioning activities carried out by sub-contractors, vendors and operations personnel
Jun'11 - Apr'12 The Club - Port Baku, Fitness and SPA Center (Pasha Construction), Azerbaijan as Senior Maintenance Technician
Coordinating construction works at club before opening
Coordinating electrical, water pipes, AHU, Fire Alarm system, Swimming pool construction and installation before opening
Responsible for operating AHU, Heating, Cooling systems, fire alarm system
Responsible for operating in swimming pool area (OZONE system, UV system, water filters, water tank)
Installing Precor Cardio Vascular equipment
Installing Precor Bikes, strength machines
Installing all other sport equipment
Responsible for all Strength and Cardio machines and updating programs on Precor P80 Console
Maintaining all sport equipment in working condition
May'09 - Apr'10 Rapid Solutions Ltd., Azerbaijan as Instrumentation Engineer
Project Undertaken: Existing BP Platforms
Manage, updаtеand supply collected data.
Perform as instrument engineering coordinator
Develop and maintain relations with suppliers to prepare control plus data acquisition systems.
Ensure to procure instrumentation systems as specified.
Responding to Enquiries received from clients regarding instrumentation or process control systems.
Overseeing the design, implementation and commissioning of instrumentation systems.
Responsible for identifying and the procurement of instrument equipment and materials.
Carry out commissioning and testing of instrumentation systems.
Reporting to Operations Manager, carrying out final checking and testing and generation of applicable documentation for instrumentation systems or process control systems.
Jul'08 - Apr'09 Kellogg Brown and Root (KBR), Azerbaijan as Instrument Engineer
Project Undertaken: ACG and Shah Deniz Sangachal
Develop and establish instrument requisitions and specifications.
Ensure to determine inconsistencies and issues present on equipment parameters or P&IDs at design phase.
Ensure new and current electronic systems complying with latest safety rules
Develop electronic copies of instrument parameters and relate text file of database information.
Review design of instrument-and-control for adherence with customer needs and applicable codes.
Identify need of instrument revisions on basis of equipment specification revisions.
Comply with all established procedures and guidelines related with instrument engineering.
Input and revise Ex register data spreadsheets for sybsystems according to instrument datasheets
Maintaining backup and revision documentation for control systems and instrumentation
Input and extract data from BP Database
Oct'07 - Jun'08 Iteca Caspian LLC (ITE Exhibitions Group), Azerbaijan as Technical and Administrative Focal Point - Supervisor
Organizing meeting and supervising representatives
Single point accountable (SPA) for all issues at specific assets
Responsible for planning and coordinating company activities
Responsible for the coordination of all company departments & divisions in order to achieve the stated goals
Responsible for timely presentation of quotations for invoicing
Jul'06 - Aug'06 / Jan'07 - Sep'07 Schlumberger, Azerbaijan as Field Specialist
Preparing equipment and tools for rigs
Assembling tools
Inspecting and testing tools
Preparing tasks
Jul'05 - Dec'05 Azercell Telecom J.V., Azerbaijan as Customers Relations (CR)
Answering customers' questions according to the data in the related programs
Making necessary actions according to customer requests (via related programs)
Accepting & recording customers' problems & complaints
Treating customers in a friendly & patient manner
Apr'05 - Jul'05 AzerNEWS and AssA-Irada, Azerbaijan as Editor assistant
Searching the web
E-mailing news bulletins
Assisting with publication of newspaper issues
Jan'05 - Jun'05 Lider TV (Leader TV), Azerbaijan as Video Editor
Video editing of TV programs
Producer assisting
Managing TV projects
OTHER JOB EXPERIENCE
Performing Authority
Isolation Authority
LANGUAGES:
Reading
Writing
Speaking
Understanding
Azerbaijani (native)
Excellent
Excellent
Excellent
Excellent
English
Excellent
Excellent
Fluent
Excellent
Russian
Excellent
Excellent
Excellent
Excellent
Turkish
Excellent
Excellent
Fluent
Fluent
TRAININGS:
Numero Uno - ADNOC Onshore H2S Awareness & Escape Level - II (12.05.2019 - 11.05.2020)
MediClub - First Aid Level 1 (24.11.2016-24.11.2018)
EnerMech - Energy Isolation Process training (24.06.2016-24.06.2019)
EnerMech - Energy Isolation Instrumental training (31.05.2016-31.05.2019)
Petrofac - Performing Authority (PA) (14.08.2014)
Vantage badge for offshore
PERSONAL HSE PASSPORT
OTI - CSOST + EBS (Company Specific Offshore Survival Training [including EBS])
Certificate number 05208051300792 (08.05.2013-07.05.2017)
Petrofac - Energy Isolation Electrical Training (28.09.2012)
Swagelok - Tubing Installation Training (19.07.2012)
OTI - General HSE Awareness (10.10.2011)
KPI - Customer Services Course (07-08.10.2011)
COMPUTER SKILLS:
Professional skills in InTools, AutoCAD, Adobe products, New media competence
ADDITIONAL INFORMATION:
Driving License - Category B
Passport for traveling abroad available
Free of military service
Available for business trips and overtime hours
OTHER SKILLS:
Excellent communication and relationship skills
Willing to study and improve my knowledge
Hard worker, open minded, sociable person and team player
HOBBIES:
Latin dances
Playing piano
Composing music
Certificates and reference letters available upon request
27 октября, 2016
Антон
Город
Свободный
Возраст
52 года ( 1 января 1972)
26 октября, 2016
Владимир
Город
Свободный
Возраст
49 лет ( 4 февраля 1975)
18 апреля, 2014
Мария
Город
Свободный
Возраст
41 год (13 апреля 1983)